September 10, 2026
On a Tuesday morning in May, a Streetsblog reporter walked through Zamora Park and found it already working the way a neighborhood park is supposed to work. Seniors were putting laps in on the new decomposed granite walking path. Kids were testing out the playground. The basketball courts had a game going. None of it was staged for a ribbon cutting. It was just a Tuesday.
That scene is worth pausing on, because Zamora Park has existed since 1969. The land was never the problem. What changed is what the land could actually do for the roughly 12,000 people who live within a half-mile of it, a radius where Zamora is the only public park at all, according to figures cited by Trust for Public Land. For a stretch of the Hayes neighborhood hemmed in by the 10 and 605 freeways, Ramona Boulevard, and the shopping center around the Longo Toyota dealership, this 4.48-acre lot was it. The next-closest park you could reach without crossing a freeway on-ramp was Lambert Park, about a mile away.
So the park was there. What wasn't there, for years, was a reason to trust it.
In 2017, residents told the city and Trust for Public Land something specific during community outreach: the playground equipment was deteriorating, the benches and tables were falling apart, and the lighting wasn't sufficient to make the park feel usable after dark. That's not a vague complaint about a neighborhood in decline. It's a punch list. And it's the punch list that eventually became an $8.4 million capital project, publicly costed out when the renovation was first announced in 2022.
The rebuild that opened this year addressed that list directly:
The city marked the completion with a community open house on June 3, 2026. If you live within that half-mile radius and haven't walked through since, the amenities above are the difference between the park your kids' friends' parents warned you about and the one that's already drawing a Tuesday-morning crowd.
Here's what actually makes this story worth telling to people who already live in El Monte, rather than filed away as one more "new park opens" item: the way Zamora got funded didn't come from a routine city capital budget. It came out of a specific advocacy partnership between Best Start El Monte/South El Monte and Trust for Public Land, a nonprofit park developer, working the case for this one park.
That partnership worked well enough that First 5 LA used it as the direct model for a new countywide program. The agency's own description of its Link initiative, which stands for Advocates, Governments, Families and Parks, states plainly that Link was modeled after the collaboration that got Zamora Park improved in the first place. In other words, the mechanism that eventually rebuilt this park in El Monte is now the same mechanism First 5 LA is using to fund park upgrades in other underinvested LA County communities.
That's the detail that flips the usual civic-improvement narrative. It's tempting to read a four-year gap between the 2022 announcement and the 2026 reopening as bureaucratic drag. The more accurate read is that El Monte's residents and Trust for Public Land weren't just fixing one park. They were building a case study that Los Angeles County has since scaled up. A First 5 LA spokesperson put the underlying problem bluntly at the time: money for park upgrades tends to flow to communities that already have the grant-writing capacity to chase it, which usually means wealthier areas. Zamora Park's rebuild happened because a specific coalition here did that unpaid, often invisible work first.
It's worth sitting with why this particular park carried so much weight for so many people. Trust for Public Land's own project language describes El Monte as roughly twice as dense as the Los Angeles average. Density on its own isn't a story. Density combined with a park desert bounded by two freeways is.
The Hayes neighborhood sits in a pocket where getting to green space that isn't Zamora means either driving or navigating freeway on- and off-ramps on foot or by bike. For families with young kids or older residents who don't drive, that's not a minor inconvenience. It's the difference between a park being a five-minute walk and effectively inaccessible. Trust for Public Land's stated goal for the project was creating access to green space within a ten-minute walk of home for Hayes neighborhood families, a neighborhood the same organization notes was once home to a labor camp during segregation, a piece of local history that shaped who ended up settling here and why investment lagged for decades.
El Monte has a separate, longer-running planning effort that could eventually make it easier to reach parks like Zamora without a car: the city's Valley Boulevard and Main Street Complete Streets Feasibility Study. As of the most recent public reporting on the project, the city was still refining design concepts for new bike lanes on Valley Boulevard and pedestrian improvements around the Main Street corridor, based on feedback from merchants worried about parking and access. Nothing about that project is built yet. It's a feasibility study, not a construction timeline, and residents shouldn't expect protected bike lanes on Valley Boulevard to show up alongside the splash pad this summer.
But it's the kind of project worth watching if you live near Zamora and have ever wished getting there by bike felt safer than it does today. The park's revitalization and the Complete Streets planning aren't officially linked, but they're both aimed at the same underlying problem: a neighborhood that's dense, family-heavy, and was built around car access to everything, including its own green space.
| What changed | Detail |
|---|---|
| Reopening | Community open house held June 3, 2026 |
| Project cost | Nearly $8.4 million, as announced in 2022 |
| Park size | 4.48 acres |
| Nearby population | About 12,000 residents within a half-mile, per Trust for Public Land |
| Funding model | First 5 LA's Link initiative, built on Measure A and park bond funds |
| New trees planted | More than 100 |
If you've lived in the Hayes neighborhood long enough to remember when Zamora Park felt like a place to avoid after dark, the reopening is worth a visit on its own terms. But the bigger takeaway is about how this city gets things done. El Monte residents didn't wait for a developer or a windfall grant to land in their lap. They built the advocacy case themselves, partnered with a nonprofit that knew how to turn community input into a funded design, and ended up creating a model that Los Angeles County is now replicating elsewhere. That's not a small thing for a neighborhood that spent years being told it simply wasn't a funding priority.
Whether you're bringing kids to the splash pad this summer or just walking laps before work, Zamora Park is proof that a neighborhood pushing for what it needs can end up changing how the county funds parks everywhere, not just here.
If you're thinking about what a neighborhood like Hayes, or any corner of El Monte, actually offers day to day, beyond the listing photos, Art Del Rey Realty has been paying attention to this part of the San Gabriel Valley for a long time. Let's Connect if you want a conversation grounded in what's actually happening on these streets, not just what's on the market.
Stay up to date on the latest real estate trends.
Real estate can be very personal and listening to the needs of my clients is my top priority. Contact me today!